China's
first 4500 meters manned submersible manned spherical shell, in the Chinese
heavy industry 725 factory.
It is
understood that the factory of the spherical shell with the Jiao long spherical
shell size, diameter of 2.1 meters, and used the same technology path, the
process is a bit like "slice and watermelon", namely the split with
thick plate stamping forming, and then points disc assembly, welding into the
ball. Viewed from the outside, much more than the Jiao long two observation windows
increased from 3 to 5, the big difference is that the use of our self-developed
Ti80 titanium alloy materials.
Ti80 is
developed on the basis of deep submergence is used nearly alpha titanium alloy,
with moderate intensity, Gao Ren, corrosion resistance, good weld ability, such
as performance, has been widely used in Marine areas. Manned space manned
submersible spherical shell is 4500 meters is the most important core
component, is 4500 meters manned submersible key equipment localization of the
most important link.
|